Things that have been add or finished over the past two weeks:
1. The roof is done and shingled. (Who knew there we so many colors of shingles!)
2. A ledge between the two car garge and roof was added.
3. A second peak was added to the second floor.
4. The windows were installed.
5. The front door was installed. (I still love my door from the auction!)
6. The back porch roof was framed and shingled.
Other Things:
1. The gas line was installed from the road.
2. The water and sewer lines were hooked up.
3. The front yard was graded. (See picture)
4. The house was back filled.
5. The trench for the electric was dug.