1. Jason and his dad finished all the duct work for heating and air. (Not bad for two guys who watched an instructional video Jason bought on the Internet.)
2. The PEX plumbing has all been run and Jason mounted the water heater tonight. There is still some crimping to do on the plumbing, but the runs are in the wall and to the right places.
3. The yard has been graded and is ready to be tilled and seeded sometime.
Here are some pictures of the duct work(not quite done in the pictures):
We also bought some real hardwood flooring at an online auction. Jason and his brother, Josh, drove up to Youngstown in my dad's van to pick it up. We got enough to do all of downstairs (70 boxes) and we got an excellent deal.
Xander checking out a piece of the floor.
No comments:
Post a Comment